Dual dedicated fiber for a final
Primary contribution ran on dual 40 Gbps dedicated fiber over independent paths, with mmWave as backup. The network was ready six days after the site survey.

We bring dedicated fiber into stadiums, arenas, racing circuits, and convention centers and run it straight to master control in Milan and New York. Every contribution link gets two diverse paths, red and blue, with 1 Tbps each.
Your feeds leave the venue on our fiber, not a shared public route. They land in master control, where we time, route, and watch every signal before it goes to rights holders.
Stadium, arena, circuit, or convention center. Your OB van, flypack, or production room.
We terminate the link at your production position, as an Ethernet or OTN interface.
Two geographically diverse routes, 1 Tbps dedicated on each. Optional backup on a second medium.
PTP-timed ST 2110 fabric, 600 signals, 64-source multiviewers, operators 24/7.
Broadcasters, platforms, and affiliates worldwide.
Carried per link: SMPTE ST 2110 · JPEG XS · SRT · RIST · HEVC · H.264 · NMOS · PTP
Each contribution link runs on two paths over geographically different routes. If one drops, traffic moves to the other before your audience sees it.
If the red path drops, traffic moves to blue in under 50 ms.
How Nexim venue fiber fails overLatency is a typical value for dedicated fiber links. Your SLA is written into the contract.
We set the codec and transport per link, based on your workflow and your bandwidth. The fiber stays the same.
| Format | What travels | Where it fits |
|---|---|---|
| SMPTE ST 2110 | Uncompressed video, multichannel audio, and ancillary data as separate PTP-synced flows | Full-quality contribution straight onto the MCR fabric |
| JPEG XS | Low-latency, visually lossless compressed video | High-quality contribution with less bandwidth than uncompressed |
| SRT or RIST | Compressed streams over IP with packet-loss recovery | Contribution where you already work in SRT or RIST |
| HEVC / H.264 | Compressed video | Lower-bandwidth feeds and secondary paths |
Audio over IP in master control: Dante and AES67. Intercom over IP up to 256 ports per matrix.
We plan venue fiber around how the building works on event day: where the trucks park, where the cameras sit, and where the cable can run.





Photos are illustrative and do not show Nexim facilities or specific venues. Photo credits.
Site survey, design, build, test, operation, and teardown, under one contract and one NOC that answers.
We walk the site with your production team: compound, camera positions, cable routes, and where the fiber can enter.
We design the red and blue routes, the demarcation point, and the backup layer, then plan capacity per feed.
We lay temporary fiber where needed, configure the equipment, and handle logistics and permits.
Stress tests, failover drills on both paths, on-air tests, and a joint sign-off.
The NOC watches the link through the event. Afterward we restore the site and send a technical report.
On average we are live 48 hours after the go-ahead. Complex sites are planned weeks ahead, under the same contract and the same NOC.
Event names as published by Nexim. Specific dates and venues are not disclosed.
Primary contribution ran on dual 40 Gbps dedicated fiber over independent paths, with mmWave as backup. The network was ready six days after the site survey.
Paddock, press room, broadcast, and hospitality ran on one network, private 5G and Wi-Fi 6E, with three independent paths to the PoP.
Once your link is live, master control watches it. Both rooms run live services around the clock, and each can take the full load of the other.


Continuous coverage from Milan and New York, with escalation to both rooms.
They keep both rooms in sync.
Kept 90 days or longer on request.
RBAC and mandatory MFA on NOC systems, with a full audit trail.
Where the venue or the risk calls for it, we add a backup link on a different medium.
Point-to-point and full duplex.
Slicing by service and priority.
Automatic cross-path failover.
New Running bonded cellular from the field? Nexim Media 5G, $90 per SIM / month
We bill venue fiber per project, on a multi-event contract, or under a multi-year framework agreement. You choose guaranteed capacity or usage-based pricing.
Our own licenses, spectrum, fiber, satellite, and NOC.
About 48 hours from go-ahead on average. For complex sites, we plan weeks ahead.
Two diverse paths, red and blue, with 1 Tbps of dedicated capacity each.
SMPTE ST 2110 uncompressed, JPEG XS, SRT or RIST, HEVC, and H.264. We set the codec per link.
Traffic switches from one path to the other in under 50 ms. Where needed, a backup link on licensed microwave, private 5G, or LEO satellite adds a third layer.
As Ethernet or OTN, at the position we agree on during the site survey.
Send the venue, the dates, and your feed list. We reply within one business day, in English or Italian.