NOC 24/7Venue Fiber · Broadcast contributionMilan · New York

Two paths in. One master control.

We bring dedicated fiber into stadiums, arenas, racing circuits, and convention centers and run it straight to master control in Milan and New York. Every contribution link gets two diverse paths, red and blue, with 1 Tbps each.

1 TbpsDedicated per path, red and blue
< 50 msFailover between paths
Ethernet · OTNDelivered at your production position
24/7Watched from Milan and New York
Illustrative photo · Credits
01 — Signal path

From the venue to master control, on our own fiber.

Your feeds leave the venue on our fiber, not a shared public route. They land in master control, where we time, route, and watch every signal before it goes to rights holders.

01 · VenueCameras and production

Stadium, arena, circuit, or convention center. Your OB van, flypack, or production room.

02 · Venue edgeFiber demarcation

We terminate the link at your production position, as an Ethernet or OTN interface.

03 · TransportRed path + blue path

Two geographically diverse routes, 1 Tbps dedicated on each. Optional backup on a second medium.

04 · Master controlMilan · New York

PTP-timed ST 2110 fabric, 600 signals, 64-source multiviewers, operators 24/7.

05 · DistributionRights holders

Broadcasters, platforms, and affiliates worldwide.

Carried per link: SMPTE ST 2110 · JPEG XS · SRT · RIST · HEVC · H.264 · NMOS · PTP

02 — Path diversity

Every link is built twice. Red and blue.

Each contribution link runs on two paths over geographically different routes. If one drops, traffic moves to the other before your audience sees it.

If the red path drops, traffic moves to blue in under 50 ms.

How Nexim venue fiber fails over
  • Two physically separate fiber routes per link, red and blue.
  • 1 Tbps of dedicated capacity on each path.
  • Automatic failover in under 50 ms.
  • A third layer when the venue needs it: licensed microwave, private 5G, or LEO satellite.
  • Segregated networks: VLAN, VRF, or physically separate.
1TbpsPer pathDedicated capacity, red and blue
<5msTypical latencyOn dedicated fiber
<50msFailoverBetween red and blue paths
99.99%Uptime SLAWritten into the contract

Latency is a typical value for dedicated fiber links. Your SLA is written into the contract.

03 — Transport formats

JPEG XS, SRT, or ST 2110. You pick per link.

We set the codec and transport per link, based on your workflow and your bandwidth. The fiber stays the same.

Transport formats carried over venue fiber
FormatWhat travelsWhere it fits
SMPTE ST 2110Uncompressed video, multichannel audio, and ancillary data as separate PTP-synced flowsFull-quality contribution straight onto the MCR fabric
JPEG XSLow-latency, visually lossless compressed videoHigh-quality contribution with less bandwidth than uncompressed
SRT or RISTCompressed streams over IP with packet-loss recoveryContribution where you already work in SRT or RIST
HEVC / H.264Compressed videoLower-bandwidth feeds and secondary paths

Audio over IP in master control: Dante and AES67. Intercom over IP up to 256 ports per matrix.

04 — Venues

Stadiums, arenas, circuits, and convention centers.

We plan venue fiber around how the building works on event day: where the trucks park, where the cameras sit, and where the cable can run.

Stadium at night with floodlight towers above the standsV-01 · StadiumsStadium broadcast fiberPrimary contribution from the stadium compound to master control, on two diverse paths.
Aerial view of a motor racing circuitV-02 · Racing circuitsRacetrack fiberBackhaul on race weekends, with links into the paddock, press room, and hospitality.
Stadium concert at night with a crowd in front of the stageV-03 · ArenasArena fiberIndoor sport, concerts, and tours, with the network on site for the length of the run.
Summit plenary hall with camera crews behind a rope lineV-04 · Convention centersConvention center fiberTrade fairs, congress centers, summits, and ceremonies, with protected, redundant contribution.
Camera operator in a headset on a stadium sidelineOn every siteBuilt around your productionCompound, camera positions, and cable routes mapped with your team before a meter of fiber goes in.

Photos are illustrative and do not show Nexim facilities or specific venues. Photo credits.

05 — Venue onboarding

From site survey to teardown, one team.

Site survey, design, build, test, operation, and teardown, under one contract and one NOC that answers.

  1. Survey the venue

    We walk the site with your production team: compound, camera positions, cable routes, and where the fiber can enter.

  2. Design the paths

    We design the red and blue routes, the demarcation point, and the backup layer, then plan capacity per feed.

  3. Build and light

    We lay temporary fiber where needed, configure the equipment, and handle logistics and permits.

  4. Test and go live

    Stress tests, failover drills on both paths, on-air tests, and a joint sign-off.

  5. Operate and tear down

    The NOC watches the link through the event. Afterward we restore the site and send a technical report.

48hrsAverage deploymentFrom go-ahead to live, for temporary connectivity

On average we are live 48 hours after the go-ahead. Complex sites are planned weeks ahead, under the same contract and the same NOC.

06 — Field record

Proof from the field. Names under NDA.

Event names as published by Nexim. Specific dates and venues are not disclosed.

Soccer · UEFA final

Dual dedicated fiber for a final

Primary contribution ran on dual 40 Gbps dedicated fiber over independent paths, with mmWave as backup. The network was ready six days after the site survey.

2 × 40 Gbps · Independent paths · mmWave backup · 0 on-air incidents
Motorsport · F1 Grand Prix

One network for the whole circuit, three paths out

Paddock, press room, broadcast, and hospitality ran on one network, private 5G and Wi-Fi 6E, with three independent paths to the PoP.

3 independent paths to the PoP · 8,000+ concurrent clients
07 — Monitored 24/7

Watched from Milan and New York. Both live, 24/7.

Once your link is live, master control watches it. Both rooms run live services around the clock, and each can take the full load of the other.

Milan skyline with Porta Nuova towers
MCR live 24/7Milan
Milan
--:-- CET
Escalation point for every venue link
Can take the full New York load
Lower Manhattan skyline at night
MCR live 24/7New York
New York
--:-- ET
Escalation point for every venue link
Can take the full Milan load
  1. A 24/7 NOC.

    Continuous coverage from Milan and New York, with escalation to both rooms.

  2. Redundant PTP grandmasters.

    They keep both rooms in sync.

  3. Compliance recording.

    Kept 90 days or longer on request.

  4. Controlled access.

    RBAC and mandatory MFA on NOC systems, with a full audit trail.

08 — Backup layer

Fiber first. A second medium when it counts.

Where the venue or the risk calls for it, we add a backup link on a different medium.

B-01 · Backup

Licensed microwave

Point-to-point and full duplex.

Up to 10 Gbps · < 10 ms
B-02 · Backup

Private 5G SA

Slicing by service and priority.

Up to 2 Gbps / user · 10–20 ms
B-03 · Backup

LEO satellite

Automatic cross-path failover.

Up to 200 Mbps · 40–80 ms

New Running bonded cellular from the field? Nexim Media 5G, $90 per SIM / month

09 — How you buy it

Per event, per season, or per year.

We bill venue fiber per project, on a multi-event contract, or under a multi-year framework agreement. You choose guaranteed capacity or usage-based pricing.

  1. One contract, one NOC that answers.
  2. SLA written into the contract.
  3. A network operator, not an integrator.

    Our own licenses, spectrum, fiber, satellite, and NOC.

Venue Fiber questions

How fast can you light a venue?

About 48 hours from go-ahead on average. For complex sites, we plan weeks ahead.

What capacity do I get per link?

Two diverse paths, red and blue, with 1 Tbps of dedicated capacity each.

Which formats can you carry?

SMPTE ST 2110 uncompressed, JPEG XS, SRT or RIST, HEVC, and H.264. We set the codec per link.

What happens if a path fails?

Traffic switches from one path to the other in under 50 ms. Where needed, a backup link on licensed microwave, private 5G, or LEO satellite adds a third layer.

How is the link delivered at the venue?

As Ethernet or OTN, at the position we agree on during the site survey.

Venue Fiber · NOC 24/7

Tell us the venue. We'll map both paths.

Send the venue, the dates, and your feed list. We reply within one business day, in English or Italian.